Woman in straw hat smiles, holding wine glass near a lake.

40+

Years Of Experience


Smooth and Level Sites Before Project Completion

AG Building & Excavation LLC provides final grading services for construction and site development projects in Anson, Texas.

When your job site in Anson has been excavated, backfilled, or cleared and you need the surface prepared for concrete, landscaping, or inspection, final grading smooths out high spots, fills low areas, and establishes the slope required for proper drainage. Uneven ground can cause water to pool near foundations, create tripping hazards, or prevent clean material installation during the finishing phase. AG Building & Excavation LLC uses grading equipment to bring the site to the elevation and contour specified in your plans, working on residential builds, commercial projects, and rural developments throughout Anson.

Final grading is the last earthwork step before hardscaping or landscaping begins, and it ensures that the site meets code requirements for drainage and accessibility. The process involves removing loose debris, redistributing soil to match grade stakes, and compacting the surface so it does not settle unevenly after construction is complete. It is especially important on sites with clay soils or where grading must tie into existing roads, driveways, or drainage structures.

If your project in Anson is nearing completion and needs final grading before turnover or inspection, contact the team to review your site plan and schedule the work.

How Grading Equipment Prepares a Site for Closeout

The grading operator uses a skid steer or compact track loader equipped with a laser or GPS-guided blade to match the elevations marked on your site plan. Soil is moved in thin layers, and the blade makes multiple passes to achieve a smooth, uniform surface. In Anson, where job sites often include caliche or clay subsoils, the equipment compacts each layer to prevent settling and maintain the designed slope for drainage.

After grading is finished, you will see a level surface free of ruts, mounds, or depressions, with a consistent slope that directs water away from structures and toward designated drainage areas. The site is ready for concrete forms, sod installation, or gravel placement without additional prep work. If the project requires landscaping or hardscaping, the graded surface provides a stable base that reduces the chance of cracking or shifting over time.

Final grading does not include removing large rocks, tree roots, or construction debris that should have been cleared during rough grading. It also does not address subsurface drainage issues or compaction problems deeper than the top few inches of soil. If your site has significant erosion, unstable fill, or poorly draining subsoil, those concerns need to be resolved before final grading begins to avoid rework or inspection delays.

Questions Builders and Property Owners Often Have

Before scheduling final grading, most clients want to confirm that the site is ready, understand what the operator needs to complete the work, and know how drainage is verified once grading is finished.

Black excavator digging in the ground.
What is the difference between rough grading and final grading?
Rough grading establishes the general site elevation and removes large amounts of soil, while final grading refines the surface to exact specifications for drainage, concrete placement, or landscaping.
Black excavator digging ground.
How do you verify that drainage slopes are correct?
The operator uses a laser level, GPS system, or grade stakes to confirm that the surface matches the plan and slopes away from buildings at the required rate. Water flow can also be tested after grading if needed.
Excavator digging into the ground. Black silhouette on white background.
What should be done before final grading starts?
All underground utilities, footings, and drainage structures should be installed and backfilled. Construction debris, large rocks, and temporary structures should be removed so the equipment can work efficiently.
Black excavator digging into the ground.
When should I schedule final grading on my project?
Final grading typically happens after framing and roofing are complete but before concrete flatwork, driveways, or landscaping. Timing depends on your project schedule and whether inspections require graded surfaces.
Black excavator digging into earth.
Will final grading fix low spots that collect water?
Final grading can fill and recontour low areas if they are within the planned grade elevation. If the problem is caused by poor subsurface drainage or compacted clay, additional work may be necessary before grading.

AG Building & Excavation LLC has completed final grading on new home sites, ranch infrastructure projects, and commercial developments throughout Anson and the surrounding area. If your project needs grading before inspection or turnover, contact the team to discuss your site plan and confirm the work schedule.